Goodnight, goodnight, construction site
(CD + Book)
Author
Contributors
Format
CD + Book
Appears on these lists
Status
Youth Picture Books
EPICTURE GO RINKER
1 available
EPICTURE GO RINKER
1 available
Description
Loading Description...
Also in this Series
Checking series information...
Copies
Location | Call Number | Status |
---|---|---|
Youth Picture Books | EPICTURE GO RINKER | In Library |
More Details
Physical Desc
1 sound disc (15 min., 37 sec.) : digital ; 4 3/4 in. + 1 hardcover book (unpaged : col. ill. ; 26 cm.)
Language
English
Accelerated Reader
LG
Level 3.8, 1 Points
Level 3.8, 1 Points
Notes
General Note
Narration with or without page turn signals
General Note
Book published: San Francisco : Chronicle Books, c2011
Participants/Performers
Narrated by Dion Graham
Description
At sunset, when their work is done for the day, a crane truck, a cement mixer, and other pieces of construction equipment make their way to their resting places and go to sleep
Citations
APA Citation, 7th Edition (style guide)
Rinker, S. D., Lichtenheld, T., Graham, D., & Carroll, J. (2012). Goodnight, goodnight, construction site . Weston Woods.
Chicago / Turabian - Author Date Citation, 17th Edition (style guide)Sherri Duskey Rinker et al.. 2012. Goodnight, Goodnight, Construction Site. Weston Woods.
Chicago / Turabian - Humanities (Notes and Bibliography) Citation, 17th Edition (style guide)Sherri Duskey Rinker et al.. Goodnight, Goodnight, Construction Site Weston Woods, 2012.
MLA Citation, 9th Edition (style guide)Rinker, Sherri Duskey, Tom Lichtenheld, Dion Graham, and Jon Carroll. Goodnight, Goodnight, Construction Site Weston Woods, 2012.
Note! Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy. Citation formats are based on standards as of August 2021.
Staff View
Loading Staff View.